EstiMe
Estimate Manager
From inspection
to Excel — fast.
Upload your deficiency PDF, configure issues, link materials, and export a full estimate workbook in minutes.
✓Claude Vision counts every map marker
✓Materials + labour auto-roll-up
✓3-sheet Excel export with live formulas
© 2026 EstiMe · estime.now

Welcome back

Sign in to your workspace

EstiMe
Estimate Manager
Current Project
··
—
Estimator
Dashboard
Active Projects
—
 
Total Estimates
—
Across all projects
⚑ Drafts
—
Not yet configured
Materials
—
In database

Recent Projects

Step 1 — Upload & Analyze PDF

Upload a pre-cleaned inspection PDF (deficiency list + building map pages). Text pages become issue names; map pages are counted by Claude Vision.

Materials for this project

Restrict which material categories the pickers in this project offer. Leave all unchecked to allow every material. (Categories are managed in the Material Database.)

Step 4 — Calculate Estimate

Roll up the configured issues into materials, labour (incl. building set-up), and a subtotal. Only counted issues that are not per-location or optional are included. Recalculate after editing counts or configs above.

Step 5 — Export to Excel

Download a 3-sheet workbook: Estimate (materials + labour as static values, financial summary as live Excel formulas), Supplemental (per-location + optional issues), and Raw (flat table for Dataforma). Uses the same calculation as Step 4 — recalculate there first if you edited counts or configs.

Material Database

Add Material

Categories (a material can belong to several)

Your material groupings (e.g. membrane system, coverage approach). These are the classifier the site-visit assembly picker filters by — a material can be in several.

Reusable across every site-visit project. An assembly is a named set of your materials (e.g. Self-adhered TPO). Assigning an assembly to a roof section copies its materials in (then editable per section). Tag each material's system (TPO/SBS/EPDM/Shingle) on the material itself to filter the picker.

Reusable across every site-visit project. Equipment you rent (boom lift, scaffold), bins for tear-off, and the disposal fee itself. Adding one to a project copies its values in, so changing a price here never moves a quote you have already given.

The roof build-ups you tear off, reusable across every site-visit project. Setting one on a roof area is what turns its measured area into a disposal weight and volume.

A square is 100 square feet — the unit roofing is measured in, so a 1,200 SF area is 12 squares.

Tonnes per square is what the transfer station bills you for, so every system needs one.

Cubic yards per square is optional and is only used to work out how many bins the tear-off fills; leave it blank if you have not measured it.

New Project

How do you want to build this estimate?

New Project

EstiMe
⚑ SHARED · READ ONLY

You can edit counts, per-location flags, notes, hours, material assignments, and equipment rentals. Unit prices are set by the owner and read-only.